Installation conditions : three options
1. Concession contract:
- for a term of 10 to 30 years ;
- Investments to be made on the site granted on the basis of a concession ;
- Annual tonnage to be guaranteed by waterway :
- 400 t/running metre of quay/year for general cargo and scrap;
- 750 t/running metre of quay/year for bulk goods (coal, sand, ores,...) ;
- 600 t/running metre of quay/year for mixed operations.
2. Precarious authorisation :
- occupation for an indefinite period, generally a short period (6 months, 1 year, 2 years, ...) ;
- notice, on either side : 1 month ;
- no heavy investment;
- highly flexible system for short-term operations.
3. Authorisation for individiual operations :
- authorisation for one or several port loading / unloading operations or other
(consolidation / breakdown of load, storage ) ;
- revocable, very time-limited.
Comments :
- Any structure or fixed installation has to be authorised by the port;
- Urban planning, fire department, public inquiry chargeable to the customer /user.